Remote gas monitoring apparatus for seabed drilling
Abstract
Gas monitoring apparatus associated with a remotely operated seabed system, the apparatus including a detector which is adapted so as to enable detection and/or measurement in real time the interception of shallow gas in a bore hole. In one form the gas monitoring apparatus is suitable for use with a drilling rig for drilling into a sea bed, the drilling rig including a drill string. The gas monitoring apparatus includes a housing with a collecting chamber therein for receiving drilling fluid returns which result from a drilling operation. The apparatus further includes a discharge conduit for discharging the drilling fluid returns from the collecting chamber, the collecting chamber and discharge conduit being configured so that the drilling fluid is discharged in a stratified flow which includes a predominantly dissolved gas containing phase, and if present a free gaseous phase. A gas sensor is associated with the discharge conduit and positioned so as to sense any gas in the predominantly dissolved gas containing phase and transmit the measured gas concentration signal in real-time to a surface operating station. In another form the apparatus includes a gas monitoring probe assem
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 25 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
Underwater gas monitoring apparatus associated with remotely operated seabed survey equipment, the apparatus including a detector which includes a collector for continuously collecting drilling fluid returns and contacting the drilling fluid returns with an underwater gas sensor so as to enable detection and measurement in real time the interception of gas in a bore hole, the collector including a collecting chamber for receiving the drilling fluid returns which result from a drilling operation, the drilling fluid returns including fluid containing solids from the drilling operation and, if pr
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (25)
Non-Patent Literature (3)
- http://www.wipertrip.com/well-control/planning/478-shallow-gas-planning-guidelines.html, printed Feb. 25, 2014, 3 pages.
- Issues Surrounding a Shallow Gas Database in Relation to Offshore Hazards (OTH 504) Offshore Technology Report Series R. Holmes, Health and Safety Commission Staff, S. A. Alexander, K. C. Ball, Great Britain. Health and Safety Executive, J. Bulat, Queen's University of Belfast Evans, D. Long, C. D.
- Supplementary European Search Report EP 05 77 7938 Apr. 19, 2013 4 Pages.