Delayed reactive electrical consumption mitigation
Abstract
The electrical consumption mitigation provided by energy storage systems can be unreliable when a consumption peak lasts long enough to deplete the energy stored and the remainder of the peak is unmitigated. By implementing a waiting period between detecting the peak and discharging the energy storage in which characteristics of the peak are observed, a peak mitigation system can lengthen the effective discharge duration of the energy storage system and prevent unmitigated plateaus from appearing. For example, when a consumption plateau is detected, the system may discharge at a slower rate than when a spike is detected in order to prolong mitigation activities before the conclusion of the plateau. Thus otherwise-incurred demand-related utility charges can be reduced without having to increase the capacity of the mitigation system. In some cases, these processes are performed with respect to the bounds of demand-averaged time periods used to calculate demand charges.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 33 · Forward citations: 3.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of controlling the discharge of an energy storage system (ESS) for electricity consumption mitigation, the ESS being connected to an electrical system at a site, the method comprising: detecting a peak in electricity consumption of an electrical system at the site; responsive to detecting the peak, preventing the ESS from discharging for purposes of mitigating the consumption of the peak from when the peak is detected until a waiting period has elapsed; measuring an electricity consumption indicating parameter of electrical system during the waiting period; and discharging energy from
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗