Patents
US 9,026,257 B2#44908605 Most CitedActiveUnited States (USPTO)Utility

Real-time optimization of hydropower generation facilities

2Forward Citations (#44908605 Global)
0.2/yrCitation Velocity (#35848180 Global)
0.89Citation PageRank (#48223357 Global)
40Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

Operation of a hydropower generation facility may be optimized by consideration and analysis of multiple factors influencing function of the facility. Aspects of the facility and surrounding hydraulic system are represented in a model that may include efficiency curves for hydropower turbines. Efficiency curves for one or more turbines are approximated by piecewise linear functions. The use of piecewise linear representations allows for calculation of recommended operational settings as well as predicted outputs in real time. An optimization system may consider input data such as weather and market prices for electricity. The input data may also include desired operational outputs of the hydropower generation facility. A user interface may present recommendations for specific operational settings to achieve the desired operational outputs.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 40 · Forward citations: 2.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A method for real-time optimization of a hydropower generation facility comprising: receiving a request for a quantity of electricity; receiving efficiency curve data for each of a plurality of hydropower turbines; creating, by one or more processors in a computing device, piecewise linear representations of the efficiency curve data; and identifying, based at least in part on the piecewise linear representations, operational parameters of the plurality of hydropower turbines that result in generating at least the quantity of electricity at a high efficiency.

  2. Claim 2Depends on #1

    The method of claim 1 , wherein the efficiency curve data includes at least one indication of a rough zone and the identifying is based at least in part on the rough zone.

  3. Claim 3Depends on #1

    The method of claim 1 , wherein at least one of the plurality of hyd

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (2 of 2 total)

References Cited — Backward Prior Art (40)

PatentTitleYearCitations
US 4,255,787 ASystem and method for controlling the power generated by a system of hydro-plants and thermal units198124
US 4,674,279 AControl system for run-of-river hydroelectric plant198796
US 4,794,544 AMethod and apparatus for automatically index testing a kaplan turbine198863
US 5,347,446 AModel predictive control apparatus1994344
US 5,742,515 AAsynchronous conversion method and apparatus for use with variable speed turbine hydroelectric generation199837
US 5,757,665 ARiverine community habitat assessment and restoration methodlogy199822
US 5,812,421 ASystem for cooperatively operating river management facilities199818
US 5,913,179 AMethod for spatial and temporal analysis of nested graphical data199916
US 5,953,227 AMethod and apparatus for monitoring hydroelectric facility performance costs199921
US 6,038,494 AControl system for enhancing fish survivability in a hydroelectric power generation installation200021
US 6,269,287 B1Method and apparatus for monitoring a hydroelectric facility trash rack and optimizing performance200125
US 6,490,506 B1Method and apparatus for monitoring hydroelectric facility maintenance and environmental costs200267
US 2003041039 A1Business management system and method for a deregulated electric power market using workspace portals.—22
US 2003041038 A1Business management system and method for a deregulated electric power market in a shortage situation—18
US 2003041017 A1Business management system and method for a deregulated electric power market using consumer selected special offers—42
US 2003041016 A1Business management system and method for a deregulated electric power market using cooperatively produced estimates—38
US 2003093332 A1Business management system and method for a deregulated electric power market—40
US 2004253097 A1Hydropowered turbine system—18
US 6,889,141 B2Method and system to flexibly calculate hydraulics and hydrology of watersheds automatically200523
US 2005102173 A1Method and system for managing regulatory information—59
US 2005160128 A1Methods and systems for power systems analysis—53
US 2006072014 A1Smart optical sensor (SOS) hardware and software platform—85
US 2006206240 A1System and method for managing and optimizing power use—57
US 2007112443 A1Methods and systems for adaptive control—60
US 2007150157 A1Speed control method for vehicle approaching and traveling on a curve—52
US 2007162189 A1Method and Apparatus for Determining Actual Reactive Capability Curves—29
US 2008004721 A1Method and Apparatus for Providing Economic Analysis of Power Generation and Distribution—18
US 7,349,831 B2River assessment, monitoring and design system20084

Non-Patent Literature (5)

  • "Mini-Hydro Power", Oct. 11, 2010, 8 pages.
  • "Solving Linear Systems: Irerative Methods and Sparse Systems", COS 323, Princeton University lecture notes, 2006, pp. 1-25.
  • "Vista Reference Guide Overview", Synexus Global, retrived on Jul. 29, 2011 at <<http://www.synexusglobal.com/pdfs/Reference-Guide-Supplement-A-Overview-Version-5-0.pdf>>, 69 pages.
  • Aquatic Informatics, retrieved on Mar. 8, 2011 at <<http://www.aquaticinformatics.com/>>, 1 page.
  • Aquatic Informatics, retrieved on Mar. 8, 2011 at >, 1 page.