Activity points based effort estimation for package implementation
Abstract
Techniques and solutions are provided for determining overall effort for a package implementation program. Determining overall effort can comprise determining a program parameter complexity value for each of a plurality of program parameters, determining activities for program phases and program work streams, calculating an activity point value for each determined activity, and calculating overall effort for the package implementation program. The activity point values can be calculated using, at least in part, the program parameter complexity values. Calculating the overall effort can use, at least in part, the activity point values and a pre-determined productivity metric that is specific to a type of the package implementation program.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 27 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method, implemented at least in part by a computing device, for determining overall effort in person-months for a package implementation program, the method comprising: determining a program aspect parameter complexity value for each of a plurality of program aspect parameters; determining activities for program phases and program work streams; calculating, by the computing device, an activity point value for each determined activity, wherein the activity point values are calculated using, at least in part, the program aspect parameter complexity values and heuristics; calculating, by the co
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (27)
Non-Patent Literature (5)
- Bundschuh et al. "The IT Measurement Compendium" -Chapter 8 "Product and Process Metrics", Springer Berlin Heidelberg, 2008, pp. 207-239.
- Bundschuh et al. "The IT Measurement Compendium" —Chapter 8 "Product and Process Metrics", Springer Berlin Heidelberg, 2008, pp. 207-239.
- Francalanci, "Predicting the implementation effort of ERP projects: empirical evidence on SAP/R3", Journal of Information Technology, 2001, pp. 33-48.
- Ooi et al. "Developing an Activity-based Costing Approach for System Development and Implementation", ACM, Summer 2003, vol. 34, No. 3.
- Ooi et al., "Developing an Activity-based Costing Approach for System Development and Implementation," The DATA BASE for Advances in Information Systems, vol. 34, No. 3, pp. 54-71, Aug. 2003.