Patents
US 9,003,353 B2#95228337 Most CitedActiveUnited States (USPTO)Utility

Activity points based effort estimation for package implementation

0Forward Citations (#95228337 Global)
0.0/yrCitation Velocity (#95228337 Global)
0.56Citation PageRank (#95228337 Global)
27Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Techniques and solutions are provided for determining overall effort for a package implementation program. Determining overall effort can comprise determining a program parameter complexity value for each of a plurality of program parameters, determining activities for program phases and program work streams, calculating an activity point value for each determined activity, and calculating overall effort for the package implementation program. The activity point values can be calculated using, at least in part, the program parameter complexity values. Calculating the overall effort can use, at least in part, the activity point values and a pre-determined productivity metric that is specific to a type of the package implementation program.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 27 · Forward citations: 0.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method, implemented at least in part by a computing device, for determining overall effort in person-months for a package implementation program, the method comprising: determining a program aspect parameter complexity value for each of a plurality of program aspect parameters; determining activities for program phases and program work streams; calculating, by the computing device, an activity point value for each determined activity, wherein the activity point values are calculated using, at least in part, the program aspect parameter complexity values and heuristics; calculating, by the co

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (27)

PatentTitleYearCitations
US 6,073,107 AParametric software forecasting system and method2000128
US 2003018952 A1System and method to estimate resource usage for a software development project—134
US 2003101114 A1System and method for collecting and analyzing tax reporting surveys—15
US 6,601,233 B1Business components framework20031,297
US 2003149745 A1Method and apparatus for accessing information from a network data source—28
US 6,658,643 B1Method and apparatus for computer software analysis200352
US 2004194055 A1Method and program product for costing and planning the re-hosting of computer-based applications—73
US 2004243996 A1Method of scheduling hosts for software updates in a distributed computer network—33
US 2005086045 A1Question answering system and question answering processing method—81
US 2005114829 A1Facilitating the process of designing and developing a project—655
US 6,938,007 B1Method of pricing application software200568
US 2006053149 A1Method and system for supporting development of information systems based on EA—5
JP 2006134225 ASoftware customization man-hour estimation system, software customization man-hour estimation method and software customization man-hour estimation program—12
US 2007011496 A1Method and system for design and analysis of fastened joints—16
US 2007074148 A1System and method for selecting a suitable technical architecture to implement a proposed solution—42
US 2007276712 A1Project size estimation tool—18
US 7,328,202 B2System and method for software estimation200818
US 2008320447 A1Method of accessing web parameters—2
US 2009100404 A1Software package implementation sizing—15
US 2009249278 A1METHOD AND SYSTEM FOR IMPLEMENTING A COMPLETE SAP SYSTEM LANDSCAPE ON IBM SYSTEM i—3
US 2010036715 A1Method and system for estimating productivity of a team—3
US 2010198631 A1Supplier stratification—30
US 7,801,834 B2Method and apparatus for estimator tool20107
US 2011016447 A1Method for improving execution efficiency of a software package customization—16
US 2012179508 A1Tool for controlling complex systems—7
US 8,230,385 B2Test effort estimator20128
US 8,418,123 B2Software development production management system, computer program, and recording medium201315

Non-Patent Literature (5)

  • Bundschuh et al. "The IT Measurement Compendium" -Chapter 8 "Product and Process Metrics", Springer Berlin Heidelberg, 2008, pp. 207-239.
  • Bundschuh et al. "The IT Measurement Compendium" —Chapter 8 "Product and Process Metrics", Springer Berlin Heidelberg, 2008, pp. 207-239.
  • Francalanci, "Predicting the implementation effort of ERP projects: empirical evidence on SAP/R3", Journal of Information Technology, 2001, pp. 33-48.
  • Ooi et al. "Developing an Activity-based Costing Approach for System Development and Implementation", ACM, Summer 2003, vol. 34, No. 3.
  • Ooi et al., "Developing an Activity-based Costing Approach for System Development and Implementation," The DATA BASE for Advances in Information Systems, vol. 34, No. 3, pp. 54-71, Aug. 2003.