Verification of status schemas based on business goal definitions
Abstract
Methods, systems, and computer-readable storage media for evaluating a validity of a status and action management (SAM) schema. In some implementations, actions include receiving the SAM schema, the SAM schema being stored as a computer-readable document in memory, providing one or more goals, each goal representing an intention of the SAM schema, the one or more goals being provided in a computer-readable document stored in memory and including one or more primary goals and one or more recovery goals that each express an intention of a process underlying the SAM schema, and processing the one or more goals using a computer-executable model checking tool for evaluating the validity of the SAM schema.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A computer-implemented method for evaluating a validity of a status and action management (SAM) schema, the method being executed using one or more processors and comprising: receiving, by the one or more processors, the SAM schema, the SAM schema being stored as a computer-readable document in memory; providing, by the one or more processors, one or more goals, each goal representing an intention of the SAM schema, the one or more goals being provided in a computer-readable document stored in memory and comprising one or more primary goals and one or more recovery goals that each express an i
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- "Business Process Modeling Notation Specification", Final Adopted Specification, dtc/Feb. 1, 2006, Object Management Group, Feb. 2006, 284 pages.
- "Object Constraint Language", OMG Available Specification, Version 2.0, formal/May 1, 2006, Object Management Group, May 2006, 232 pages.
- "Unified Modeling Language: Infrastructure", Version 2.1.1 (without change bars), formal/Feb. 6, 2007, Object Management Group, Feb. 2007, 220 pages.
- "Unified Modeling Language: Superstructure", Version 2.0, formal/Jul. 4, 2005, Object Management Group, Aug. 2005, 694 pages.
- "Unified Modeling Language: Superstructure", Version 2.1.1 (non-change bar), formal/Feb. 5, 2007, Object Management Group, Feb. 2007, 716 pages.