Residential/enterprise network connection management and CSFB scenarios
Abstract
A method, system and device are provided for managing LIPA and/or SIPTO connection releases when UE moves out of residential/enterprise network coverage in case service continuity is not supported for the LIPA/SIPTO PDN connection(s). To address problems caused by not providing service continuity for LIPA/SIPTO PDN connections, the PDN connection/PDP context created in the HeNB/HNB by the MME/SGSN includes context information related to the UE indicating whether such connection is a LIPA PDN connection PDN connection or not. In addition, each UE may be configured to reconnect or not reconnect to the PDN corresponding to a certain APN or service, depending on how the PDN connection was disconnected by the network.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 32 · Forward citations: 2.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method in a first network element of a wireless communications network, the method comprising: receiving a first message from a mobility management entity (MME), the first message associated with causing a circuit switched fallback (CSFB) procedure to move a User Equipment (UE) from the first network element to a second network element; determining that Packet Switched Handover (PS HO) is not available for the CSFB procedure because the UE has only one or more Local IP Access (LIPA) packet data network (PDN) connections at the first network element; and sending a second message to the UE in
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (2 of 2 total)
References Cited — Backward Prior Art (32)
Non-Patent Literature (5)
- 3GPP TR 23.829 V10.0.1; 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Local IP Access and Selected IP Traffic Offload (LIPA-SIPTO); Release 10; Oct. 2011; 43 pages.
- 3GPP TR 23.830 V9.0.0; 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Architecture Aspects of Home NodeB and Home eNodeB; Release 9; Sep. 2009; 55 pages.
- 3GPP TS 23.003 V11.0.0; 3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; Numbering, Addressing and Identification; Release 11; Dec. 2011; 81 pages.
- 3GPP TS 23.060 V11.0.0; 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; General Packet Radio Service (GPRS); Service Description; Stage 2; Release 11; Dec. 2011; 326 pages.
- 3GPP TS 23.203 V11.4.0; 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Policy and Charging Control Architecture; Release 11; Dec. 2011; 167 pages.