System and method for failure prediction for artificial lift systems
Abstract
A computer-implemented reservoir prediction system, method, and software are provided for failure prediction for artificial lift systems, such as sucker rod pump systems. The method includes a production well associated with an artificial lift system and data indicative of an operational status of the artificial lift system. One or more features are extracted from the artificial lift system data. Data mining is applied to the one or more features to determine whether the artificial lift system is predicted to fail within a given time period. An alert is output indicative of impending artificial lift system failures.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 11.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for failure prediction for artificial lift well systems, the method comprising: providing a production well associated with an artificial lift system and data indicative of an operational status of the artificial lift system; extracting one or more features from the data; applying data mining to the one or more features to determine whether the artificial lift system is predicted to fail within a given time period, wherein applying data mining to the one or more features comprises: constructing a training set comprising true positive events; iteratively adding false negative events in
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (11 of 11 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- Basu, Sugato, et al.; "Semi/supervised Clustering by Seeding"; Proceedings of the 19th International Conference on Machine Learning, (ICML), Jul. 2002, pp. 19-26, Sydney, AU.
- Bremner, Chad, et al.; "Evolving Technologies: Electrical Submersible Pumps"; Oilfield Review, Winter 2006/2007, pp. 30-43.
- Final Office Action mailed Sep. 27, 2013, during the prosecution of Co-Pending U.S. Appl. No. 13/118,067, filed May 27, 2011.
- Non-Final Office Action mailed Jun. 19, 2014, during the prosecution of Co-Pending U.S. Appl. No. 13/118,067, filed date May 27, 2011.
- Non-Final Office Action mailed Mar. 17, 2014, during the prosecution of Co-Pending U.S. Appl. No. 13/351,318, filed Jan. 17, 2012.