Method to replace an instrument case and replacement case therefor
Abstract
A method designed to replace a compromised instrument case with a new case without the need to disconnect any wire, relay or any other electric equipment is described herein. The instrument panel is supported for example by a temporary support frame during the dismantling of the old case and the assembly of the new case. The new case is therefore assembled on site around the instrument panel. The new instrument case includes a floor which is made of at least two parts, one on each side of the wiring. The instrument case therefore remains in a normal working mode during the entire replacement procedure thus preventing downtime. As well, the amount of manpower required for the replacement of an instrument case is drastically reduced.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 1.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for replacing an old railroad instrument case along a railroad track with a new railroad instrument case, the old railroad instrument case including at least one instrument panel connected from outside the old railroad instrument case through wiring passing through a hole in an old floor of said old railroad instrument case, the old railroad instrument case primarily used to control rail traffic and crossing gates through one or more networks that is connected through the wiring, the method comprising: supporting each of the least one instrument panel; removing the old railroad instru
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗