Patents
US 8,934,459 B2#1321153 Most CitedActiveUnited States (USPTO)Utility

Maintaining time alignment with multiple uplink carriers

41Forward Citations (#1321153 Global)
3.7/yrCitation Velocity (#551416 Global)
9.28Citation PageRank (#1200107 Global)
13Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Maintaining time alignment with multiple carriers is contemplated. A group of uplink carriers (UL CC sets) that operate with a single Timing Advance (TA) may be determined, and a TA value may be applied to a specific UL CC set. A wireless transmit/receive unit's (WTRU) capability of using multiple TAs may define a group index of a few bits for each UL CC set. A TA Command received in a Random Access Response message may be used to apply the TA value to each UL carrier of the UL CC set. The WTRU may determine which UL CC set the TA value applies to based on which DL carrier the command was transmitted from. The WTRU may determine which UL CC set the TA value applies to based on the Group Index being explicitly provided in the command. The WTRU may release multi-CC configurations upon Time Alignment Timer (TAT) expiry.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 13 · Forward citations: 41.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A wireless transmit/receive unit (WTRU), comprising: a processor, the processor configured, at least in part to: identify one or more uplink carriers with which the WTRU is operating; determine one or more sets of serving cells with at least two configured uplink component carrier sets (UL CC sets), each of the at least two UL CC sets comprising one or more of the uplink carriers, each of the one or more uplink carriers that comprise a respective UL CC set operating with the same Timing Advance (TA), each of the at least two UL CC sets operating respectively with a first TA and a second TA, an

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (5)

  • 3rd Generation Partnerhip Project (3GPP), R2-095484, "Impact of Carrier Aggregation on MAC Layer", CATT, 3GPP TSG-RAN WG2 Meeting #67bis, Miyazaki, Japan, Oct. 12-16, 2009, 5 pages.
  • 3rd Generation Partnership Project (3GPP), R2-094637, "Number of MAC PDUs for Relay Operation", LG Electronics Inc., 3GPP TSG-RAN WG2 #67, Shenzhen, China, Aug. 24-29, 2009, 2 pages.
  • 3rd Generation Partnership Project (3GPP), R2-095519, "Carrier Aggregation and Timing Advance", Nokia Siemens Networks, 3GPP TSG-RAN WG2 Meeting #67bis, Miyazaki, Japan, Oct. 12-16, 2009, 2 pages.
  • 3rd Generation Partnership Project (3GPP), R2-095815, "Different Timing Advance Impact on Carrier Aggregation", Huawei, 3GPP TSG RAN WG2 Meeting #67bis, Miyazaki, Japan, Oct. 12-16, 2009, 3 pages.
  • 3rd Generation Partnership Project (3GPP), R2-096506, "Consideration on RACH Procedure and RLF", CATT, 3GPP TSG RAN WG2 Meeting #68, Jeju, Korea, Nov. 9-13, 2009, 2 pages.