Method for metering a reducing agent, method for setting up a control unit for a metering device and motor vehicle having a metering device
Abstract
A method for metering a reducing agent from a metering device to an exhaust gas treatment device includes initially determining at least one operating parameter of the metering device. An injector pressure at an injector for feeding the reducing agent into the exhaust gas treatment device is then calculated from the at least one operating parameter. Then, an opening time for the injector is calculated, in which at least the injector pressure determined in step b) is used. The injector is then opened for the opening time calculated in step c). A method for setting up or configuring a control unit for a metering device and a motor vehicle having a metering device are also provided.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 19 · Forward citations: 2.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for metering a reducing agent from a metering device to an exhaust gas treatment device, the metering device having an injector and a delivery unit with a pump and a pressure sensor, the delivery unit and the injector being connected by a line leading from the delivery unit to the injector, the method comprising the following steps: a) determining at least one operating parameter of the metering device the at least one parameter being a system pressure in the delivery device determined by the sensor and providing the at least one operating parameter to a control unit; b) calculating i
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗