Method for erecting a facility producing electrical energy from wind
Abstract
A method for erecting a facility includes the steps of constructing initial tower panels on a foundation. Work platforms and guys are installed so that additional tower panels may be installed on top of the existing tower panels. The work platforms with guys may then be raised, so that the process may be repeated until tower section height is reached. Tower sections are them completed by the addition of peripheral trusses and permanent guys, and additional tower sections are constructed by repeating the process to reach the desired facility height. Lifting units including truss and rail systems and rotatable modules with turbines in shrouds are assembled on the ground, then raised up the towers and operably mounted for generating electricity from wind. The erection process is sequenced to maintain structural integrity.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 13.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for erecting a facility for producing electrical energy from wind, the method comprising the steps of: constructing a foundation to support the facility; constructing at least four towers, including one core tower and at least three peripheral towers, on the foundation, the construction comprising the steps of: (1) erecting at least four tower panels on the foundation to start the at least four towers; (2) operably mounting work platforms at the bases of at least four towers; (3) connecting and tensioning temporary guys between each peripheral work platform and the bases of two adjace
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗