Scheduling ahead for improving data transmission in case of measurement
Abstract
An approach is provided for scheduling communication resources to minimize the effects of a measurement gap. The timing between a resource allocation grant for a communication link, corresponding data transmission, and associated error control transmissions is delayed to avoid transmitting data to or receiving data from a user equipment during a measurement gap.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 9 · Forward citations: 6.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A machine-executable method comprising: determining an initiation point and a duration of a measurement gap that permits a user equipment to perform measurements; allocating an uplink resource of a communication link to the user equipment prior to the initiation point of the measurement gap by scheduling an uplink transmission; and determining, at least in part based on whether the uplink resource is allocated within a predetermined period prior to the initiation point of the measurement gap, reception of the uplink transmission to commence beyond the time period of the measurement gap.
- Claim 2Depends on #1
The machine-executable method according to claim 1 , wherein the resource allocation is signalled implicitly on a physical hybrid automatic repeat request indication channel, explicitly on a physical downlink control channel, or by a netw
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (6 of 6 total)
References Cited — Backward Prior Art (9)
Non-Patent Literature (5)
- 3GPP TR 25.813 V7.1.0, 3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Universal Terrestrial Radio Access Network (E-UTRAN); Radio interface protocol aspects (Release 7), Sep. 2006, 41 pgs.
- 3GPP TR 25.814 V1.5.0, "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Physical Layer Aspects for Evolved UTRA (Release 7)", May 2006, 125 pgs.
- 3GPP TS 36.300 V9.4.0, "3rd Generation Partnership Project; Technical Specification Group Radio Access Network; Evolved Universal Terrestrial Radio Access (E-UTRA) and Evolved Universal terrestrial Radio Access Network (E-UTRAN); Overall description; Stage 2 (Release 9)", Jun. 2010, 171 pgs.
- Ericsson, "Idle Gaps for Handover Measurements in E-UTRAN", 3GPP TSG-RAN WG2 #58bis, R2-072544, Orlando, USA, Jun. 25-29, 2007, 7 pages.
- International Search Report and Written Opinion received in corresponding Patent Cooperation Treaty Application No. PCT/IB2009/050092, May 13, 2009, 12 pages.