Single trip multi-zone completion systems and methods
Abstract
Disclosed are systems and methods of producing from multiple production zones with a single trip multi-zone completion system. One method includes arranging an outer completion string within an open hole section of a wellbore, the outer completion string having at least one sand screen disposed thereabout, extending a production tubing within the outer completion string, the production tubing having at least one interval control valve disposed thereon, communicably coupling the production tubing to the completion string at a crossover coupling having one or more control lines coupled thereto, actuating the at least one interval control valve to initiate production into the production tubing at the at least one interval control valve, and measuring one or more fluid and/or well environmental parameters external to the outer completion string with a surveillance line communicably coupled to one or more control lines at the crossover coupling.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 1.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of producing from one or more formation zones, comprising: arranging an outer completion string within an open hole section of a wellbore adjacent the one or more formation zones, the outer completion string having at least one sand screen disposed thereabout and a surveillance line arranged between the one or more formation zones and the at least one sand screen, wherein the surveillance line extends externally along the outer completion string; extending a production tubing within the outer completion string, the production tubing having at least one interval control valve, a contro
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- Halliburton Brochure entitled "Sand Control Systems, Enhanced Single Trip Multizone (ESMTZ tm) System", H06382, 2009.
- Halliburton Energy Services, Inc. "IV Series Interval Control Valves," H06972 dated Aug. 2009, 2 pages.
- Halliburton Energy Services, Inc. "Long Space-Out Travel Joint (LSOTJ)," H08460, dated Dec. 2011, 2 pages.
- Halliburton Energy Services, Inc. "Scrams", H06976, Feb. 2012, 2 pages.
- Halliburton Energy Services, Inc., "Sand Control Systems", H06382, company article dated Jul. 2009, 6 pages.