Rescheduling failed backup jobs
Abstract
Techniques for rescheduling a failed backup job are described in various implementations. A method that implements the techniques may include identifying a failed instance of a backup job, and determining an estimated amount of time to complete a rescheduled execution of the failed instance. The method may also include determining an available window of time in a backup schedule that equals or exceeds the estimated amount of time to complete the rescheduled execution, and rescheduling the failed instance for execution during the available window of time.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 15 · Forward citations: 2.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method of rescheduling a failed backup job, the method comprising: identifying, using a computing system, a failed instance of a backup job; determining, using the computing system, an estimated amount of time to complete a rescheduled execution of the failed instance; determining, using the computing system, an available window of time in a backup schedule that equals or exceeds the estimated amount of time to complete the rescheduled execution; adding a buffer of time to at least one of a beginning and an end of the available window of time; and; rescheduling, using the computing system, t
- Claim 2Depends on #1
The method of claim 1 , wherein determining the estimated amount of time to complete the rescheduled execution is based on historical backup information assoc
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (2 of 2 total)
References Cited — Backward Prior Art (15)
Non-Patent Literature (2)
- "Rerun Faded Avamar VMDK Backup Jobs"; Feb. 17, 2011; 3 pages.
- "Restart Failed Backup Job Automaticaily in Backup Exec"; 11 pages.