Underground mining
Abstract
In developing an underground mine a mine shaft 80 is formed by excavating earth and removing excavated material from the shaft 80 by a material transport system comprising skips 36 movable up and down on skip guides within the shaft. Tunnels 82 are launched from a bottom part of shaft 80 by excavating a cavern 81 in which a tunnel boring machine is assembled and operated to bore the tunnels 82 . Material from the tunnel excavation is transported from the tunnels via conveyor 87 to the material transport system established within the shaft during formation of the shaft which is operated to transport that material to an earth surface region.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 4.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of developing an underground mine, comprising: forming a mine shaft by excavating earth from beneath a galloway to form a hole extending downwardly from an earth surface region; removing excavated material from the hole during the formation of the shaft by a material transport system comprising a material transfer station mounted on the galloway, the material transport system being operable to transport the excavated material, via the transfer station, upwardly through the hole to the earth surface region for discharge at the earth surface region; locating the galloway and material tr
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (4 of 4 total)
References Cited — Backward Prior Art (7)
Non-Patent Literature (3)
- Cheng Wen-Lon, Planning and Design of the Hsuehshan Tunnel, pp. 1-23, date unknown.
- International Search Report in International Application No. PCT/AU2010/000821; Mailing Date: Aug. 16, 2010.
- Tseng Dar-jen, et al, Additional Working Faces through the Shaft of Hsuehshan Tunnel, Tunnel Construction, Sup. pp. 337-343. dated Aug. 2007 (with English Abstract and partial translation).