Patents
US 8,897,780 B2#9959295 Most CitedActiveUnited States (USPTO)Utility

Managing energy consumption of base stations

10Forward Citations (#9959295 Global)
0.8/yrCitation Velocity (#8694745 Global)
3.01Citation PageRank (#7531721 Global)
16Prior Art Cited
2Claims (1 Indep. · 1 Dep.)
0Drawings / Sheets

Abstract

A base station includes an emulation controller ( 20 ) configured to receive signals indicating that another base station in an active mode managing a cell, having a predetermined cell identity and coverage area, will go into an idle mode and no longer manage the cell, and to determine terminal activity in the cell. A baseband processing unit ( 18 ) is connected to the emulation controller ( 20 ) and configured to emulate the active mode of the other base station by taking over management of the cell, in at least part of its coverage area, using the same cell identity.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 16 · Forward citations: 10.

Claims (2 — 1 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    A method of operating a base station, comprising: receiving signals indicating that another base station will transition from an active mode in which that base station manages a cell, to an idle mode in which that base station no longer manages the cell, wherein the cell has a coverage area and a predetermined cell identity; determining information about terminal activity in the cell; and emulating the active mode of the other base station by taking over management of the cell, in at least part of its coverage area, using the predetermined cell identity, wherein said taking over includes the b

  2. Claim 2Depends on #1

    The method of claim 1 , further compr

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (16)

Non-Patent Literature (2)

  • 3rd Generation Partnership Project. "Dynamic Setup for HNBs for Energy Savings and Interference Reduction," 3GPP TSG RAN WG3 Meeting #59bis, R3-080658, Shenzhen, China, Mar. 31-Apr. 3, 2008.
  • 3rd Generation Partnership Project. "Solution for interference Reduction SON Use Case," 3GPP TSG RAN WG3 Meeting #61bis, R3-081174, Kansas City, US, May 5-6, 2008.