Patents
US 8,874,875 B2#23850065 Most CitedActiveUnited States (USPTO)Utility

ICC-NCQ command scheduling for shingle-written magnetic recording (SMR) Drives

4Forward Citations (#23850065 Global)
0.3/yrCitation Velocity (#22871051 Global)
1.54Citation PageRank (#21872940 Global)
11Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

ICC-NCQ priority and deadline information in conjunction with an estimation of command access time that is specific to SMR drives are used improve command queue optimization. Estimated completion times are determined based on the internal subcommands that the drive has to execute to complete the host read or write command taking into account whether all or part of the data will be or already is stored in write-twice cache, E-region and/or I-region. The command processor selects the next command for execution based on calculated access times with adjusted priority based on the specified deadline for the command. As the deadline approaches, the priority of the command increases. For high priority data writes as specified by a host, an optimized storage plan is selected as appropriate using the “write-twice cache” (WTC) region, E-region or I-region.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 11 · Forward citations: 4.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method of operating a data storage device the method comprising: adding a read command received from a host to a command queue, the command queue already having at least one previously received command stored therein; for each logical block address (LBA) specified in the read command determining whether a storage location for the LBA is currently in a write-twice cache, an E-region or an I-region as mapped in an indirection system, determining a set of subcommands, including a number of seek commands, required to retrieve all of the logical block addresses (LBAs), estimating a completion tim

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗