Detection and classification of failures of power generating equipment during transient conditions
Abstract
Monitoring of transient operation of a turbine includes identifying a start condition and a stop condition for the transient operation and defining a path from the start condition to the stop condition wherein the path comprises a plurality of sequentially arranged sub-segments. Also, a respective value is obtained of each of a plurality of operating parameters for each respective sub-segment of the path and, then, for each of the respective sub-segments, a determination is made if the respective value of each of the plurality of operating parameters matches a respective predetermined allowable value for that particular operating parameter.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 11 · Forward citations: 3.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method for monitoring transient operation of a turbine, comprising: identifying a start condition and a stop condition for the transient operation; defining a path from the start condition to the stop condition wherein the path comprises a plurality of sequentially arranged sub-segments; obtaining a respective value of each of a plurality of operating parameters for each respective sub-segment of the path; and for each of the respective sub-segments, determining if the respective value of each of the plurality of operating parameters matches a respective predetermined allowable value for tha
- Claim 2Depends on #1
The method of claim 1 , further comprising: determining a respective error score for each of the plurality of operating parameters based, at least in part, on: in how many of the respective sub-
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (3 of 3 total)
References Cited — Backward Prior Art (11)
Non-Patent Literature (1)
- Francesco Casella. "Fast Start-up of a Combined-Cycle Power Plant a Simulation Study with Modelica", Sep. 5, 2006, XP055043683, Retrieved from the Internet URL https//www.modelica.org/events/modelica2006 Proceedings/sessions/Session1a1 pdf [retrieved on Nov. 9, 2012] the whold document.