Remediation of relative permeability blocking using electro-osmosis
Abstract
A bottomhole assembly is provided with a cathode. The cathode produces a static field in the earth formation and by the electroosmotic effect, inhibits the invasion of the formation by borehole fluids and reduces formation damage. The cathode also results in improved estimates of formation permeability using flow tests. A cathode on a wireline string may be used to reduce water saturation in an invaded zone near a borehole.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 23 · Forward citations: 0.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A system configured to conduct drilling operations of an earth formation, the system comprising: a bottomhole assembly (BHA) configured to be conveyed by a drilling tubular in a borehole in the earth formation; a drillbit on the BHA configured to drill a borehole; a circulating water-based borehole fluid in the borehole at overbalanced pressure surrounding the BHA; and a cathode associated with the BHA configured to produce a static electric field in the earth formation; wherein the water-based borehole fluid comprises sufficient cations to bias the water-based borehole fluid toward the cathod
- Claim 2Depends on #1
The system of claim 1 further comprising: a probe configured to make a fluid flow test in the borehole; and a process
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.