Method and system for synchronizing chamber down times by controlling transport sequencing in a process tool
Abstract
A cluster tool may be operated on the basis of an enhanced sequencing regime in which the supply of substrates is controlled such that a planned time of maintenance is reached for two or more process chambers simultaneously. Consequently, the occurrence of non-correlated sequential down times of various process chambers may be significantly reduced, thereby enhancing throughput and availability of complex cluster tools.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 28 · Forward citations: 4.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of processing substrates in a manufacturing environment according to a sequence of interrelated process steps, the method comprising: determining a first metric for a first process chamber of a first plurality of process chambers used to perform a first process step of said sequence of interrelated process steps, said first metric indicating a first remaining substrate processing capability for said first process chamber, wherein a first planned maintenance event occurs in response to consumption of the first remaining substrate processing capability; determining a second metric for a
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (4 of 4 total)
References Cited — Backward Prior Art (28)
Non-Patent Literature (1)
- Yamaguchi,(Machine translation http://www4.ipdl.inpit.go.jp/Tokujitu/PAJdetail.ipdl?N0000=60&N0120=01&N2001=2&N3001=2002-217076).