Startup for DC/DC converters
Abstract
A design and method for controlling the initial inductor current in a DC/DC switching regulator. The T on or T off time, depending upon implementation, is gradually increased such that power applied to a load is initially constrained until the system reaches a stable state, at which time normal power is connected to the load. In an embodiment, the on or off time is limited by a circuit which controls a pair of complementary transistors. The states of the transistors are controlled by the use of a startup-phase voltage and a reference voltage, which are then compared in an error amplifier. The result of the comparison is compared to a sawtooth signal in a comparator, the output of which controls the state of complementary transistors.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 31 · Forward citations: 3.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A startup circuit for controlling initial current in a DC/DC switching regulator, comprising an input for receiving power from a primary power source, an output adapted to be connected to a load, a first pair of switches connected together at a first midpoint node, each having a control terminal, and the pair having first and second terminals, wherein the first terminal receives power from the primary power source and the second terminal is connected to ground, and the load receives power during normal operation via the midpoint node, driver logic connected to each of the control terminals of
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗