Devices and methods for positioning TOWs in marine seismic systems
Abstract
A method and system for deploying seismic tows, such as seismic streamers, from a common carrier rope for conducting marine seismic surveys. The deployment system generally comprises a carrier rope having at least one deflector urging the carrier rope laterally relative to the towing vessel and seismic tows that are independently moveable along the deployed carrier rope to desired locations from which to be deployed. The carrier rope may be deployed from the tow vessel into the water prior to deploying the seismic streamer(s) into the water.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 13 · Forward citations: 0.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for performing a marine seismic survey, comprising: deploying into the water from a tow vessel a carrier rope comprising an outer deflector urging the deployed carrier rope laterally relative to the path of the moving tow vessel; positioning a first seismic streamer in the water from the deployed carrier rope, wherein a first streamer-connector moveably connects the first seismic streamer to the deployed carrier rope and the positioning comprises moving the first streamer-connector laterally along the deployed carrier rope; positioning a second seismic streamer in the water from the d
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (13)
Non-Patent Literature (1)
- International Search Report and Written Opinion of PCT Application No. PCT/US2012/023566 dated Sep. 5, 2012: pp. 1-9.