Lag calculation with caving correction in open hole
Abstract
A gas analyzer system that can detect atmospheric air gasses in drilling mud is used to calculate an actual lag time in a well. The calculated lag time and a theoretical lag time may be compared to estimate a caving percentage in an open hole section of the well.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 4 · Forward citations: 5.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of estimating an amount of caving in an open hole drilling well, comprising: calculating by a gas analyzer system an actual lag for a well by detecting a predetermined component of atmospheric air in a drilling fluid with a gas analyzer probe, comprising: detecting a connection event; detecting a change in an amount of the predetermined component of atmospheric air in the drilling fluid corresponding to the connection event; determining a first quantity of mud pump strokes at an end of the connection event; determining a second quantity of mud pump strokes at a beginning of the change
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (5 of 5 total)
References Cited — Backward Prior Art (4)
Non-Patent Literature (2)
- International Search Report and Search Opinion for PCT Application No. PCT/US2012/025844, dated May 31, 2012, 8 pages.
- Whittaker, A., "Chapter 52 Mud Logging," Petroleum Engineering Handbook, Society of Petroleum Engineers, Jan. 1, 1987.