Patents
US 8,770,281 B2#18736120 Most CitedActiveUnited States (USPTO)Utility

Multiple infill wells within a gravity-dominated hydrocarbon recovery process

6Forward Citations (#18736120 Global)
0.5/yrCitation Velocity (#15881083 Global)
1.31Citation PageRank (#28331185 Global)
20Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A method for recovering hydrocarbons from a subterranean reservoir by operating a substantially gravity-controlled recovery process with two adjacent well pairs. Each well pair includes an injector well and a producer well. A mobilized zone forms around each well pair through the gravity-controlled recovery process, and a bypassed region forms between the adjacent well pairs when the respective mobilized zone of each well pair merge to form a common mobilized zone. A plurality of infill producer wells are provided in the bypassed region. The plurality of infill producer wells are operated to establish fluid communication between the plurality of infill producer wells and the common mobilized zone. Once fluid communication is established, the plurality of infill producer wells and the adjacent well pairs are operated under a substantially gravity-controlled recovery process, and hydrocarbons are recovered from the plurality of infill producer wells and from the producer wells.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 20 · Forward citations: 6.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method of producing hydrocarbons from a subterranean reservoir, comprising: a. operating a first injector-producer well pair under a substantially gravity-controlled recovery process, the first injector-producer well pair forming a first mobilized zone in the subterranean reservoir, the first injector-producer well pair comprising a first substantially horizontal injector well and a first substantially horizontal producer well; b. operating a second injector-producer well pair under a substantially gravity-controlled recovery process, the second injector-producer well pair forming a second m

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (20)

PatentTitleYearCitations
US 4,166,503 AHigh vertical conformance steam drive oil recovery method197923
US 4,166,502 AHigh vertical conformance steam drive oil recovery method197919
US 4,166,501 AHigh vertical conformance steam drive oil recovery method197925
US 4,166,504 AHigh vertical conformance steam drive oil recovery method197923
US 4,177,752 AHigh vertical conformance steam drive oil recovery method197911
CA 1,130,201 AMethod for continuously producing viscous hydrocarbons by gravity drainage while injecting heated fluids198218
US 4,501,325 AMethod for predicting workovers and shut-ins from analyzing the annulus effluent of a well198517
US 4,620,594 AVertical conformance steam drive oil recovery method19867
US 4,637,461 APatterns of vertical and horizontal wells for improving oil recovery efficiency198723
US 4,646,824 APatterns of horizontal and vertical wells for improving oil recovery efficiency198715
US 4,718,485 APatterns having horizontal and vertical wells1988102
US 4,727,937 ASteamflood process employing horizontal and vertical wells198859
US 6,257,334 B1Steam-assisted gravity drainage heavy oil recovery process2001143
US 2006162922 A1Methods of improving heavy oil production—23
CA 2,591,498 A1Recovery process—9
US 2007295499 A1Recovery process—28
US 7,527,096 B2Methods of improving heavy oil production200927
US 7,556,099 B2Recovery process200937
US 2010193193 A1Subterranean system and method for treating and producing oil—12
US 2011174488 A1Accelerated start-up in sagd operations—28

Non-Patent Literature (5)

  • Chakrabarty, et al., SAG-D Process in the East Seniac Field: From Reservoir Characterization to Field Application (1998).
  • Chona, et al., SPE 37087 Evaluation of a Horizontal Infill Well in a Mature Cyclic-Steam Project (1996).
  • EnCana Foster Creek Approval/AEUB Application (2004).
  • EnCana PowerPoint Presentation for the Foster Creek Development May 18, 2005.
  • EnCana PowerPoint Presentation for the Foster Creek Development May 30, 2006.