Hydrocarbons production installation and method
Abstract
Some embodiments include a heavy-oil-based hydrocarbons effluent production installation for the production of hydrocarbons from at least one well. The installation includes an effluent-lightening fluid injection system at the bottom of the well, an effluent-evacuation pump, a plurality of sensors that measure physical units relating to the installation, and an automated device suitable for optimizing the lightening-fluid injection flow-rate and for regulating the pump speed. The automated device regulates the pump speed according to the physical units and a predetermined target production value. The speed of the pump and the physical units are within a predetermined range of values. some embodiments include a hydrocarbons production method in such an installation. Some embodiments make it possible to ensure a minimum consumption of lightening fluid, while ensuring good operation of the pump and good productivity of the well.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 14 · Forward citations: 4.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A heavy-oil-based hydrocarbons effluent production installation for a production of hydrocarbons from at least one well, the installation comprising: an effluent-lightening fluid injection system at a bottom of the well; an effluent-evacuation pump; a plurality of sensors for measuring physical units relating to the installation; and an automated device for optimizing a lightening-fluid injection flow-rate and for regulating a speed of the pump, according to the physical units and a predetermined target production value, the pump speed and the physical units each within a predetermined range o
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (4 of 4 total)
References Cited — Backward Prior Art (14)
Non-Patent Literature (2)
- International Preliminary Report on Patentability with English Translation for PCT/FR2008/001260, Dec. 29, 2009 (completion date), Total S.A.
- International Search Report and Written Opinion with English Translation for PCT/FR2008/001260, May 14, 2009 (mailing date), Total S.A.