Patents
US 8,708,100 B2#3305368 Most CitedActiveUnited States (USPTO)Utility

Rail-guided climbing system

24Forward Citations (#3305368 Global)
2.0/yrCitation Velocity (#2065306 Global)
2.28Citation PageRank (#11791012 Global)
28Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A rail-guided climbing system having climbing brackets ( 36, 38, 40 ) in which climbing rails ( 32, 34 ) are guided, rigidly fixed to a scaffolding unit ( 12 ). Each climbing bracket ( 32, 34 ) has a joint ( 52 ) arranged between a first climbing bracket ( 40 ) and a second climbing bracket ( 38 ). The free end of the climbing rail ( 32, 34 ) may be inserted into a climbing bracket ( 36, 40 ) rigidly fixed on the construction ( 16 ) and the angular position of adjacent climbing rail sections ( 48, 50 ) is adjusted via the joint ( 52 ) using an adjuster device ( 58, 68 ).

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 28 · Forward citations: 24.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A rail-guided climbing system, the climbing system structured to support and lift a scaffold unit of a climbing formwork to build a structure having a wall, the climbing system comprising: a first climbing bracket structured for attachment to the wall at a first wall location; a second climbing bracket structured for attachment to the wall at a second wall location disposed above said first wall location; a third climbing bracket structured for attachment to the wall at a third wall location disposed above said second wall location; a first climbing rail section; a second climbing rail section

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗