Patents
US 8,700,371 B2#12196139 Most CitedActiveUnited States (USPTO)Utility

System and method for controlling an advancing fluid front of a reservoir

9Forward Citations (#12196139 Global)
0.8/yrCitation Velocity (#10019249 Global)
1.56Citation PageRank (#21450016 Global)
24Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A system and method for controlling an advancing water front in a reservoir toward a wellbore is provided. The system has a production control unit. The production control unit has a reservoir unit for producing a reservoir model and a production path unit for producing a production path model that determines at least one pressure parameter about the wellbore during a life of the wellbore. The production control unit has a production optimizer unit for producing a well plan that optimizes a function of the wellsite. The production control unit may be for controlling an advancing fluid front in the reservoir with at least one control device, and wherein a production path is constructed based on the well plan.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 24 · Forward citations: 9.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    An integrated production control unit for controlling an advancing fluid front of fluid in a reservoir toward a wellbore at a wellsite, the production control unit comprising: a reservoir model unit for producing a reservoir model; a production path unit for producing a production path model that determines at least one pressure parameter about the wellbore during a life of the wellbore; and a processor that executes a production optimizer unit for producing a well plan that optimizes at least one function of the wellsite and defines a production path based on the reservoir model and the produ

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

References Cited — Backward Prior Art (24)

PatentTitleYearCitations
US 4,114,687 ASystems for producing bitumen from tar sands197817
US 4,114,691 AMethod for controlling sand in thermal recovery of oil from tar sands197812
US 2002027004 A1Computer controlled injection wells—37
US 2002092701 A1Use of autonomous moveable obstructions as seismic sources—21
US 2003201098 A1In situ recovery from a hydrocarbon containing formation using one or more simulations—49
US 2003220750 A1methods for monitoring fluid front movements in hydrocarbon reservoirs using permanent sensors—32
US 6,778,918 B2Methods for monitoring fluid front movements in hydrocarbon reservoirs using permanent sensors200431
US 2005119911 A1Method and system and program storage device for generating an SWPM-MDT workflow in response to a user objective and executing the workflow to produce a reservoir response model—97
US 2006069511 A1Gas reservoir evaluation and assessment tool method and apparatus and program storage device—16
US 7,055,600 B2In situ thermal recovery from a relatively permeable formation with controlled production rate200619
US 7,069,148 B2Gas reservoir evaluation and assessment tool method and apparatus and program storage device200637
US 2007143020 A1Transversely isotropic model for wellbore stability analysis in laminated formations—24
US 2007198223 A1Dynamic Production System Management—57
US 2008149203 A1Developing a flow control system for a well—11
US 2009164188 A1Method for upscaling a reservoir model using deep reading measurements—50
US 2009294122 A1Flow simulation in a well or pipe—62
US 7,725,302 B2Method and system and program storage device for generating an SWPM-MDT workflow in response to a user objective and executing the workflow to produce a reservoir response model201039
US 2011040543 A1Virtual reservoir sensor—8
US 2011226481 A1Apparatus and Method for Controlling Fluid Flow Between Formations and Wellbores—9
US 2012016649 A1System and method for controlling an advancing fluid front of a reservoir—53
US 8,307,893 B2Method of improving waterflood performance using barrier fractures and inflow control devices20126

Non-Patent Literature (5)

  • Atkinson, "Flow performance of horizontal wells with inflow control devices", Euro. Jnl of Applied Mathematics (2004), vol. 15, pp. 409-450, 2004 Cambridge Press, DOI: 10.1017/S0956792504005546.
  • Green, D. et al., "Perry's Chemical Engineer's Handbook", McGraw-Hill Professional, 2007, p. 794.
  • Neylon, "Modeling well inflow control with flow in both annulus and tubing", 2009 SPE Reservoir Simulation Symposium, The Woodlands, Texas, USA, Feb. 2, 2009, SPE 118909, pp. 1-13.
  • Penmatcha, "A comprehensive reservoir/wellbore model for horizontal wells", 1998 SPE India Oil and Gas Conference and Exhibition, New Delhi, India, Feb. 17, 1998, SPE 39521, pp. 1-14.
  • Thompson, "Modeling of flow in a near-wellbore network", Proceedings of the ASME 2009 28th International Conference on Ocean, Offshore and Arctic Engineering, Honolulu, Hawaii, USA, May 31, 2009, OMAE2009-79808, pp. 1-7.