Automatic place and route method for electromigration tolerant power distribution
Abstract
The present disclosure relates to an electromigration tolerant power distribution network generated by an automatic place and route (APR) methodology. In some embodiments, an automatic place and route tool constructs a local power network having multi-level power rails. The multi-level power rails have interleaved segments of vertically adjacent metal layers, wherein each interleaved segment is shorter than a predetermined characteristic length corresponding to a Blech length. By limiting the length of the interleaved metallization segments, electromigration within the multi-level power rails is alleviated, allowing for the maximum current density requirement (J max ) for mean time to failures (MTTF) to be increased.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 18 · Forward citations: 12.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
An auto place and route method, comprising: placing a plurality of standard cells using a place and route tool, wherein each standard cell comprises one or more power taps configured to provide a connection between a circuit element within said each standard cell and a local power network, which is configured to provide power to the standard cells; and connecting the one or more power taps to one or more multi-level power rails of the local power network using the place and route tool, wherein the one or more power rails comprise interleaved segments of vertically adjacent metal wire layers th
- Claim 2Depends on #1
The method of claim 1 , wherein the one or more multi-level power rails extend along bounda
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (12 of 12 total)
References Cited — Backward Prior Art (18)
Non-Patent Literature (1)
- Lee Eng Han, "Gate to GDSII Place & Route Methodology", www.eda-utilities.com, 2007, p. 1-33.