Process of polymer modified asphalt preparation
Abstract
A process of preparing a polymer modified asphalt (PMA) comprising mixing a predetermined amount of a polymer-asphalt master batch with a predetermined amount of an asphalt-cross linking agent blend. The polymer-asphalt master batch comprises at least one polymer and a first asphalt. The asphalt-cross linking agent blend comprises a second asphalt and at least one cross linking agent. A predetermined amount of the polymer-asphalt master batch is blended with a predetermined amount of the asphalt-cross linking agent blend to form a PMA blend. Mixing of the PMA blend is performed without substantial delay following blending of the polymer-asphalt master batch with the asphalt-cross linking agent blend.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 18 · Forward citations: 2.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A process for preparing a polymer modified asphalt (PMA) comprising: i) providing a polymer-asphalt master batch comprising at least one polymer and a first asphalt; ii) providing an asphalt-cross linking agent blend comprising at least one cross linking agent and a second asphalt, wherein said asphalt-cross linking agent blend is prepared by mixing the at least one cross linking agent into the second asphalt at a temperature of about 120 to about 200° C., for about 0.2 to about 3.0 hours; iii) blending a predetermined amount of the polymer-asphalt master batch with a predetermined amount of t
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗