Offset valve bore in a reciprocating pump
Abstract
A fluid end ( 15 ) for a multiple reciprocating pump assembly ( 12 ) comprises at least three plunger bores ( 61 or 91 ) each for receiving a reciprocating plunger ( 35 ), each plunger bore having a plunger bore axis ( 65 or 95 ). Plunger bores being arranged across the fluid head to define a central plunger bore and lateral plunger bores located on either side of the central plunger bore. Fluid end ( 15 ) has suction valve bores ( 59 or 89 ), each suction valve bore receiving a suction valve ( 41 ) and having a suction valve bore axis ( 63 or 93 ). Discharge valve bores ( 57 or 87 ), each discharge valve bore receiving a discharge valve ( 43 ) and having a discharge valve bore axis ( 63 or 93 ). The axes of at least one of suction ( 10 ) and discharge valve bores is inwardly offset in the fluid end from its respective plunger bore axis.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 8.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A fluid end for a multiple reciprocating pump assembly, the fluid end comprising: at least three cylinder chambers; at least three respective plunger bores in fluid communication with a respective cylinder chamber, each plunger bore receiving a reciprocating plunger, each plunger bore having a plunger bore axis, the plunger bores being arranged across the fluid end to define a central plunger bore and lateral plunger bores located on either side of the central plunger bore, the respective plunger bore axes of the lateral plunger bores defining a first distance therebetween; at least three resp
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (8 of 8 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- A. Al-Hashem et al., Cavitation Corrosion Behavior of Some Cast Alloys in Seawater, from Industrial Corrosion and Corrosion Control Technology, Pub. By Kuwait Institute for Science.
- B.N. Cole; Strategy for Cross-Bores in High Pressure Containers; Journal Mechanical Engineering Science; vol. 11 No. 2 1969; pp. 151-161.
- Canadian Examiner's Report issued by the CIPO, dated Jan. 10, 2013, regarding App No. 146,660.
- Co-pending U.S. Appl. No. 29/461,771, filed Jul. 26, 2013.
- Examination Report issued by Intellectual Property India, dated Jan. 3, 2013, regarding Indian Design Application No. 248994.