US 8,635,833 B2#22430542 Most CitedActiveUnited States (USPTO)Utility

Top-down method for constructing below-grade structures

5Forward Citations (#22430542 Global)
0.4/yrCitation Velocity (#19427503 Global)
1.12Citation PageRank (#35674376 Global)
9Prior Art Cited
2Claims (1 Indep. · 1 Dep.)
0Drawings / Sheets

Abstract

An earth retention system constructed with a top-down process that can be used for permanent below-grade structures, similar to a “soldier beam and lagging wall,” consists of vertical soldier piles, drainage and waterproofing, and a finished, reinforced concrete facing. The concrete facing is placed pneumatically (i.e., using so-called shotcrete). The system is well-suited to constructing below-grade portions of buildings where excavation lay back is not practical or cost effective and can incorporate permanent lateral support from tieback anchors. The below-grade structure is constructed by excavating down part way, constructing a waterproof “lift” portion of the ultimate structure, excavating down another part way, constructing another waterproof lift portion in a manner to be tied in with the lift portion immediately above, and repeating these steps until the below-grade structure is constructed to the desired depth.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 9 · Forward citations: 5.

Claims (2 — 1 Independent, 1 Dependent)

  1. Claim 1Independent Claim

    A method of constructing a waterproof foundation wall system in the ground, the method comprising the steps of: (1) installing a series of spaced-apart vertical structural steel beams in the ground; and (2) beginning at a first level of the structural steel beams and working downwardly, making the foundation wall in multiple horizontal sections, one horizontal section at a time from top to bottom, each horizontal section made by: (a) excavating soil between 4 and 8 feet to provide a limited excavated space for constructing a portion of a concrete wall; (b) positioning a waterproof cladding in

  2. Claim 2Depends on #1

    The method of claim 1 further com

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗