Method for avoiding or limiting early build due to yield decreases
Abstract
Disclosed are embodiments of an improved production planning method that avoids or limits early builds. The method comprises running a conventional production planning program using standard inputs (e.g., date effective yields). The outputs of the program (e.g., a plan including planned inventory overstocks at given times) are evaluated to determine if the program plans an early build and if the planned early build may have been triggered by a predicted decrease in yield. If an early build is planned and if a correlation exists between the decrease in yield and the early build, then, optionally, new constraints are added into the program and the program is re-run so that the early build is either avoided or limited to that of the proper yield. Thus, the method can be used to reduce early builds due to an incorrect, nominally higher, yield without requiring the user to provide any special additional input data.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 20 · Forward citations: 13.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A production planning method comprising: predicting, by a computer, a first yield for a product during a first time period and a second yield for said product during a second time period, wherein said first time period is earlier than said second time period; running, by said computer, a production planning program to develop a first plan for producing said product; evaluating, by said computer, said first plan to determine if said first plan comprises producing a predetermined quantity of said product in said first time period, when said predetermined quantity is to be consumed during said se
Technical Overview & Description