Power generation unit startup evaluation
Abstract
Various methods and systems are provided for evaluation of events such as the startup of power generation units. In one embodiment, a method includes obtaining operational data associated with a power generation unit, the operational data corresponding to a predefined period of time; determining start and end times for a startup phase associated with the power generation unit based upon a set of predefined startup conditions corresponding to the startup phase; and generating a network page including the start and times. In another embodiment, a system includes a unit evaluation system executable in a computing device that includes logic that obtains operational data associated with a power generation unit, the operational data corresponding to a predefined period of time and logic that determines start and end times for an event phase associated with the power generation unit based upon a set of predefined conditions corresponding to the event phase.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 2 · Forward citations: 0.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
A method, comprising the steps of: obtaining, by at least one computing device, operational data associated with a power generation unit, the operational data corresponding to a predefined period of time; determining, by the at least one computing device, a start time and an end time for a startup phase associated with the power generation unit based upon at least a portion of the operational data and a set of predefined startup conditions corresponding to the startup phase; generating, by the at least one computing device, a network page for rendering on a user device, the network page includ
- Claim 2Depends on #1
The method of claim 1 , wherein the operational data is obtained from a plant historian associated with the power generation unit.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (2)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 8,149,602 B2 | Method and apparatus for detecting end of start up phase | 2012 | 5 |
| US 2012151921 A1 | Method for starting a turbomachine | — | 7 |