Lifting hook for erecting steel joists
Abstract
A lifting hook for lifting open-frame steel joists comprises a casing having a shaft passing through it. The shaft has a lifting eye at one end and a hook member at the other end. The hook member comprises a U-shaped body having a transverse width selected to be less than the gap between the angles that form the upper flange of the open-frame joist. The hook member has a throat that is larger than the width of the flange. The shaft is spring-loaded so that the hook member is pulled toward the lower bearing surface of the casing so that once the hook member has been inserted into the joist, it is keyed to the flange and will not come loose.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 11 · Forward citations: 5.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method of lifting an open-frame steel joist, said open-frame steel joist comprising a double-angle flange with an open web, the double angle flange having a gap “g” between the upright legs of the angles that form the double-angle flange and a dimension “t i ,” which is the distance between the outer surfaces of the vertical legs of the angles that form the double-angle flange, the method comprising: providing a lifting hook, said lifting hook comprising a casing, a shaft and a resilient member, the casing having a lower bearing surface, the shaft comprising an elongate rod having a diameter
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (5 of 5 total)
References Cited — Backward Prior Art (11)
Non-Patent Literature (1)
- Web Page Advertisement-Freedom Tools LLC.