Method for mounting in sections an annular tower for wind power generator, heliostatic power generator or chimney composed from three concrete segments or more
Abstract
A method for erecting a pre-stressed sectionalized and segmented concrete tower for wind power or heliostatic generator or chimney is provided. The method includes the step of providing a plurality of assembling supports and lifting harnesses in order to support to the concrete segments for assembling concrete section from the concrete segments using a small capacity crane, and installing, with a high capacity crane the assembled concrete sections to conform the concrete tower. The lifting harness provides safety scaffolds for personnel during prestressing.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 25 · Forward citations: 22.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for erecting a pre-stressed sectionalized and segmented concrete tower, which includes a plurality of concrete tower sections, the method comprising the steps of: building a tower foundation; assembling a first concrete tower section of the plurality of concrete tower sections, the step of assembling the first concrete tower section comprising the steps of: fabricating a plurality of concrete segments having internal vertical and horizontal ducts for introducing pre-stressing tendons; fabricating an assembling support and a lifting harnesses for providing a support to the plurality of
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 22 total)
References Cited — Backward Prior Art (25)
Non-Patent Literature (1)
- Windblatt, The Enercon Magazine, Huge Building Blocks, exemplar Mar. 2001, Sep. 22, 2201, pp. 8-9.