Method for the construction of a civil engineering structure and associated system
Abstract
A method of construction of a civil engineering structure that includes first and second superimposed components is described. According to one embodiment of the method: the second component is positioned beneath a fixed lifting structure that includes a lifting device, the second component is lifted using the lifting device, the first component is positioned beneath the fixed lifting structure substantially below the second component, and the second component is substantially placed on the first component using the lifting device, while the second component remains substantially in place.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 14 · Forward citations: 1.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for the construction of a civil engineering structure comprising n superimposed components, where n>2, the method comprising the following steps for superimposing components: fixing a lifting structure comprising lifting means, moving horizontally a second component to a position below the fixed lifting structure, lifting the second component to a predetermined height using the lifting means, positioning a first component beneath the fixed lifting structure substantially below the second component, while the second component remains substantially at said predetermined height, and p
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (1 of 1 total)
| Patent | Title | Year | Citations |
|---|---|---|---|
| US 2012195768 A1 | Offshore wind turbine installation | — | 16 |
References Cited — Backward Prior Art (14)
Non-Patent Literature (1)
- Translation of EP0607915A1; Dec. 14, 2010.