Submerged arc welding system with pressurized flux delivery and welding torch
Abstract
A submerged arc welding system. In one embodiment, the submerged arc welding system includes a robot, a flux supply distal from the robot, and at least one wire supply distal from the robot. The system also includes a welding torch connected to the robot, a wire path connecting the wire supply to the welding torch, and a flux path connecting the flux supply to the welding torch. A flux delivery system is configured to move flux from the flux supply to the welding torch. At least one vent is disposed on the flux path adjacent the welding torch, to evacuate air from the flux path.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 19 · Forward citations: 5.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A submerged arc welding system for use with a robot having at least a base, a first arm rotatably connected to the base, and a second arm rotatably connected to the first arm, the submerged arc welding system comprising: a welding torch having a nozzle, wherein the welding torch is connected to the second arm of the robot; at least one wire supply configured to be located distal from the robot; a wire path connecting the at least one wire supply to the nozzle of the welding torch; a flux supply including a pressurized flux delivery system and a vacuum unit, the pressurized flux delivery system
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (5 of 5 total)
References Cited — Backward Prior Art (19)
Non-Patent Literature (5)
- Annex to Form PCT/ISA/206: Communication Relating to the Results of the Partial International Search; Corresponding PCT Application Serial No. PCT/IB2010/001739; Authorized Officer Dupont-Huper, Marie-Laure; Issued Dec. 1, 2010.
- Fanuc Robotics America Inc., 3900 W. Hamlin Road, Rochester Hills, MI 48309-3253; ARC Mate 120iBe; (Jun. 14, 2009).
- International Search Report; Corresponding PCT Application Serial No. PCT/IB2010/001739; Authorized Officer Gruber, Ralph; Issued Nov. 16, 2011.
- International Search Report; Corresponding PCT Application Serial No. PCT/IB2010/001739; Authorized Officer Jeggy, Thierry; Issued Nov. 3, 2010.
- Key Plant (www.key-plant.co.uk): Air Operated Flux Recovery System (Jun. 14, 2009).