Secondary power utilization during peak power times
Abstract
Systems and methods for selectively utilizing secondary power sources during peak power times are provided for. The method includes receiving a notification of a peak power time, and discontinuing use of a primary power supply and beginning use of a secondary power supply based upon the notification.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 13 · Forward citations: 0.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A method comprising: causing a device to discontinue using a primary power supply and begin using a secondary power supply based upon data from a notification system, the data comprising a date and time of at least one of a plurality of peak power events comprising a brownout and a blackout, of the primary power supply; and determining and sending to the notification system a time period which the device will use the secondary power supply.
- Claim 2Depends on #1
The method of claim 1 , wherein the device comprises a laptop computer.
- Claim 3Depends on #1
The method of claim 1 , wherein the primary power supply comprises a power grid and the secondary power supply comprises at least one of: a battery, and a back-up generator.
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (0 of 0 total)
No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.
References Cited — Backward Prior Art (13)
Non-Patent Literature (2)
- Hatori, M. et al. "Peak-Shift Method for Notebook Computers, a Power Management Approach for Load Leveling", 2004, pp. 117-121.
- Notice of Allowance for related U.S. Appl. No. 12/056,308, dated Jul. 2, 2012.