Apparatus and method for managing tasks in an industrial plant
Abstract
An apparatus for managing tasks in an industrial plant comprises a task generator for generating at least one task to be performed in the industrial plant; a task scheduler for assigning a priority to each of the at least one task by analyzing the information of the plant; and a communication module for exchanging task information with a mobile device. The information of the plant may comprise static information and dynamic information of the plant. Preferably, the at least one task may comprise an event task dynamically generated by the task generator.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 5.
Claims (2 — 1 Independent, 1 Dependent)
- Claim 1Independent Claim
An apparatus for managing tasks in an industrial plant, comprising: a task generator for generating at least one task to be performed in the industrial plant; a task scheduler for assigning a priority to the at least one task by analyzing information of the plant; and a communication module for exchanging task information with a mobile device, wherein the task scheduler analyses information of the industrial plant by checking priority of an abnormality detected in the industrial plant, checking priority of an equipment associated with the abnormality, and checking maintenance historical data a
- Claim 2Depends on #1
The apparatus according to claim 1 , where
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗