Patents
US 8,537,718 B2#15854404 Most CitedActiveUnited States (USPTO)Utility

Configuring component carriers in carrier aggregation

7Forward Citations (#15854404 Global)
0.5/yrCitation Velocity (#14804947 Global)
1.51Citation PageRank (#22750763 Global)
14Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Technology for configuring, activating and deactivating component carriers in carrier aggregation is disclosed. One method comprises configuring a Primary Component Carrier (PCC) as a primary component carrier pair comprising a downlink primary component carrier (DL PCC) and an uplink primary component carrier (UL PCC). At least one Secondary Component Carrier is configured at the eNode B as a secondary component carrier pair comprising a downlink secondary component carrier (DL SCC) and an uplink component carrier (UL SCC) based on a carrier aggregation capability of a selected UE. An activation and deactivation of each SCC is communicated from the eNode B to the UE with a bitmap carried by a media access control (MAC) control element. A bit set to “1” denotes activation of a corresponding SCC at the UE. A bit set to “0” denotes deactivation of a corresponding SCC at the UE.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 14 · Forward citations: 7.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for configuring, activating and deactivating component carriers in carrier aggregation, comprising: configuring at an enhanced Node B (eNode B) a Primary Component Carrier (PCC) as a primary component carrier pair comprising a downlink primary component carrier (DL PCC) and an uplink primary component carrier (UL PCC); receiving a carrier aggregation capability from a selected User Equipment (UE) at the eNode B, wherein the eNode B is configured to provide service for a plurality of UEs within the eNode B′s network; configuring at the eNode B at least one Secondary Component Carrier (

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Non-Patent Literature (4)

  • 3GPP TSG RAN WG2 Meeting #69,"Consideration on Component Carrier Index", San Francisco, USA, Feb. 22-26, 2010, 3 Pages.
  • Non Final Office Action received for U.S. Appl. No. 13/299,765, mailed on May 24, 2013, 21 pages.
  • Notice of Allowance received for Japan Patent Application No. 2011-088896, mailed on May 14, 2013, 1 Page only.
  • Office Action received for Japanese patent application No. 2011-088896 mailed on Sep. 11, 2012, 4 pages of Office Action and 2 pages of English translation.