Patents
US 8,528,735 B2#7870783 Most CitedActiveUnited States (USPTO)Utility

Transport frame for nacelle/rotor hub unit of a wind turbine, method of transporting and mounting a nacelle/rotor hub unit

13Forward Citations (#7870783 Global)
1.0/yrCitation Velocity (#6777802 Global)
1.56Citation PageRank (#21536999 Global)
8Prior Art Cited
2Claims (2 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

A transport frame for a nacelle/rotor hub unit of a wind turbine is provided, wherein the unit comprises a wind turbine nacelle and a wind turbine rotor hub mounted to the nacelle, the transport frame comprising a main beam for supporting the weight of the nacelle/rotor hub unit; first and second lateral stabilization elements; a holding fixture for fixing the nacelle/rotor hub unit to the transport frame; a first attachment point for a lifting appliance, the first attachment point being provided at a first end of the main beam; a second attachment point for the lifting appliance, the second attachment point being provided at the first lateral stabilization element; and a third attachment point for the lifting appliance, the third attachment point being provided at the second lateral stabilization element.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 13.

Claims (2 — 2 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A transport frame for a nacelle/rotor hub unit of a wind turbine, wherein the unit comprises a wind turbine nacelle and a wind turbine rotor hub mounted to the nacelle, the transport frame comprising: a main beam for supporting the weight of the nacelle/rotor hub unit; first and second lateral stabilization elements; a holding fixture for fixing the nacelle/rotor hub unit to the transport frame; a first attachment point for a lifting appliance, the first attachment point being provided at a first end of the main beam; a second attachment point for the lifting appliance, the second attachment p

  2. Claim 2Independent Claim

    The transport frame

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗