Patents
US 8,527,326 B2#124808681 Most CitedActiveUnited States (USPTO)Utility

Determining maturity of an information technology maintenance project during a transition phase

0Forward Citations (#124808681 Global)
0.0/yrCitation Velocity (#124808681 Global)
0.56Citation PageRank (#124808681 Global)
19Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

Techniques for determining maturity of a delivery process in an information technology maintenance project are provided. The techniques include collecting information during a delivery process, wherein the information comprises operational data, aggregating the collected information for each delivery dimension into one or more aggregate delivery measures, wherein the one or more aggregate delivery measures comprise one or more delivery dimensions, comparing the one or more delivery dimensions against a threshold to determine a level of maturity for each delivery dimension, and determining an overall level of maturity of the delivery process by combining the level of maturity for each delivery dimension.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 19 · Forward citations: 0.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method for determining maturity of a delivery process in an information technology maintenance project, wherein the method comprises: collecting information during the delivery process, wherein the information comprises operational data and historical data, said collecting carried out by a module executing on a hardware processor; aggregating the collected information for each of one or more delivery dimensions, said aggregating carried out by a module executing on a hardware processor, and wherein the one or more delivery dimensions comprise at least conformance, wherein conformance provide

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

References Cited — Backward Prior Art (19)

PatentTitleYearCitations
US 6,216,108 B1Service business management system200182
US 2002143606 A1Method and system for assessing information technology service delivery—22
US 2003055804 A1Method and system for generating management solutions—31
US 2003093310 A1Business management process—94
US 2003110124 A1Method of providing a financial event identification service—46
US 6,684,193 B1Method and apparatus for multivariate allocation of resources200451
US 2004068431 A1Methods and systems for evaluation of business performance—332
US 2004117470 A1Temporal service level metrics system and method—19
US 2005198486 A1Information technology development transformation—46
US 2007006044 A1Methods, systems, and computer program products for multi-domain component management—18
US 2008021768 A1Method and system for improved project delivery—8
US 2008126163 A1It service management technology enablement—44
US 2008249975 A1System and method of adaptive generation of problem determination decision procedures—2
US 2009111382 A1Methods for scheduling collection of key performance indicators from elements in a communications network—26
US 7,558,719 B1System and method for runtime analysis of system models for variable fidelity performance analysis200921
US 2010057519 A1System and method for assigning service requests with due date dependent penalties—10
US 7,698,188 B2Electronic enterprise capital marketplace and monitoring apparatus and method201020
US 2010161471 A1Method and system for forecasting financial statements and analysis there of—19
US 8,019,640 B2Method, apparatus, and program for implementing an automation computing evaluation scale to generate recommendations20117

Non-Patent Literature (4)

  • "Help-Desk Operations a Key Target for Efficiency Gains," Service Desk Management, Computer Economics Report, vol. 31, No. 6, Jun. 2009.
  • Basavaraj, M.J. and Shet, K.C.,"Estimating and Prediction of Turn around Time for Incidents in Application Service Maintenance Projects" Journal of Software, vol. 3, No. 7, Oct. 2008.
  • Kesner, Richard M.,"IT Service Delivery: Models and Frameworks," Enterprise Operations Management , Auerbach Publications, 2003.
  • Ritchie, George, "Service Desk/Helpdesk Metrics and Reporting: Getting Started," Serio Ltd, 2008.