System and method for optimizing drilling speed
Abstract
This invention presents various embodiments, including a system and a method, in which pressure-while-drilling data is gathered at a drilling rig and compared to modeled ECD pressure data related to the bore hole. The actual and modeled data are statistically analyzed to generate standard deviation data, which is used to infer information about how rapid a rate of penetration may safely be employed to optimize drilling results.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 8 · Forward citations: 16.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for optimizing rate of penetration when drilling into a geological formation, comprising the steps of: gathering real-time PWD (pressure while drilling) data from sensor; acquiring modeled ECD (equivalent circulating density) data; calculating a standard deviation of differences between said real-time PWD and said modeled ECD data; calculating a predicted maximum tolerable ECD based on the calculated deviation wherein said predicted maximum tolerable ECD data is based on a safety factor (SF) that is added to said standard deviation that is used as an offset from said fracture gradient
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 16 total)
References Cited — Backward Prior Art (8)
Non-Patent Literature (5)
- Calderoni, A. et al., "Balanced Pressure Drilling With Continuous Circulation Using Jointed Drill Pipe-Case History, Port Fouad Marine Deep 1, Exploration Well Offshore Egypt", Presented at 2006 SPE Annual Technical Conference and Exhibition held in San Antonio Texas, U.S.A., Delivered Sep. 24-27, 2
- Freundenrich, Craig, Ph.D. "How Oil Drilling Works", http://www.howstuffworks.com/oil-drilling.htm/printable, Printed Jun. 9, 2009.
- Halliburton, BAROiD Fluid Services, DFG (TM) Software With DrillAhead (R) Hydraulics Module, (C) Apr. 2007.
- Halliburton, Geobalance (TM), "Precise Pressure Control Services", Printed Jun. 9, 2009.
- Halliburton, Sperry Drilling Services, "GeoBalance (R) Optimized Pressure Drilling Services", (C) Jan. 2009.