Patents
US 8,522,896 B2#62081674 Most CitedActiveUnited States (USPTO)Utility

Consistent drilling fluids engineering and management

1Forward Citations (#62081674 Global)
0.1/yrCitation Velocity (#49693949 Global)
0.74Citation PageRank (#62081674 Global)
1Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

Processes and apparatus that continuously change the physical state and characteristics of drilling fluids at planned periodic intervals to consistently and correctly compensate for differing geological formation properties, wellbore characteristics, rate of penetration, solids removal efficiency, and other essential factors involved in the drilling process, comprising: initiating a system correction of a Minimum Base Required ("MBR"); and administering a dilutant to a drilling fluid according to the MBR. The system corrections may be performed recursively, adjusting the system's base dilutant and chemical product additions according to MBR. The drilling fluid consistency produced is based upon several drilling-rig specific parameters. Drilling fluid consistency is provided onsite through the use of mathematical software, base fluid, rig software that targets the programmed parameters, and scheduled treatments that are structured for stability according to the minimum amount of base dilutant and required quantity of chemical product to produce consistent drilling fluid properties.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 1 · Forward citations: 1.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A method that continuously changes a physical state and characteristics of a drilling fluid, comprising: a. initiating a system correction of a Minimum Base Required (“MBR”); b. administering a dilutant to said drilling fluid according to said MBR; and c. wherein said MBR is a difference of Minimum Dilution Required (“MDR”) and Total Product Expansions (“TPX).

  2. Claim 2Depends on #1

    The method of claim 1 , wherein said system correction is initiated at planned periodic intervals.

  3. Claim 3Depends on #1

    The method of claim 1 , wherein said system correction is initiated at predefined event conditions.

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (1 of 1 total)

References Cited — Backward Prior Art (1)