Saving power by placing inactive computing devices in optimized configuration corresponding to a specific constraint
Abstract
A system method and computer program product for managing readiness states of a plurality of computing devices. A programmed processor unit operates, upon receipt of a request, to either: provide one or more computing devices from an inactive pool to an active pool, or accept one or more active computing devices into the inactive pool. An Inactive Pool Manager proactively manages the inactive states of each computing device by: determining the desired number (and identities) of computing devices to be placed in each inactive state of readiness by solving a constraint optimization problem that describes a user-specified trade-off between expected readiness (estimated time to be able to activate computing devices when they are needed next) and conserving energy; generating a plan for changing the current set of inactive states to the desired set; and, executing the plan. Multiple alternative ways of quantifying the desired responsiveness to surges in demand are provided, and, in each case, the tradeoff between responsiveness and power savings is formulated as an objective function with constraints, and the desired number of devices in each inactive state emerges as the solution to a
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 48 · Forward citations: 26.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A system for managing inactive states of computing devices comprising: a memory, a processor unit in communication with said memory, for performing a method comprising: receiving, at said processor unit, a request to one of: activate or deactivate one or more computing devices from a respective group of inactive or active computing devices, each said inactive or active computing device initially in a pre-determined state of readiness; activating or deactivating said one or more computing devices, said activating or deactivating resulting in a number of computing devices in one or more activati
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (15 of 26 total)
References Cited — Backward Prior Art (48)
Non-Patent Literature (5)
- Benini, L., "Policy optimization for dynamic power management,"; Computer-Aided Design of Integrated Circuits and Systems, IEEE Transactions, Publication Date: Jun. 1999, vol. 18, Issue: 6, pp. 813-833, INSPEC Accession No. 6270844. Digital Object Identifier: 10.1109/43.766730. Posted online: Aug. 6
- Chase, J., et al., "Balance of Power: Energy Management for Server Clusters," Proceedings of the 8th Workshop on Hot Topics in Operating (2001). http:// citeseer.ist.psu.edu. http://www.cs.duke.edu/ari/publications/publications.html, Jan. 2001.
- Deusterwald, E., et al., "Characterizing and Predicting Program Behavior and its Variability", Proceedings of the 12th International Conference on Parallel Architectures and Compilation Techniques, Sep. 27-Oct. 1, 2003, p. 220, Abstract only.
- Nishimura, F., "Transaction Modes of Electric Energy Exchange and their Effects on Benefit Optimization and Allocation,"Conference: Energy management and power delivery-International conference, EMPD-Proceedings- , 1995; vol. 1 , p. 25-30, Publisher: Piscataway, NJ.
- Srivastava, M.B., et al., "Predictive system shutdown and other architectural techniques for energy efficient programmable computation," Very Large Scale Integration (VLSI) Systems, IEEE Transactions, Publication Date: Mar. 1996, pp. 42-55, vol. 4, Issue: 1.