Method and apparatus for bi-directional downstream adjacent crossing signaling
Abstract
First and second crossing predictors communicate with each other, and each predictor transmits signals to instruct downstream adjacent predictors to activate their warning devices at a constant warning time (referred to as DAXing) by using train detection information from the other predictor. The communications between the predictors may be rail based, wireless or wired using conductors other than rails. Multiple predictors may be present between the first and second crossing predictors, and each such predictor may be DAXed by one of the outer predictors based on the train's direction. The predictor also transmits a signal to inform the other predictor of the presence of the train so that the other predictor may determine whether to suppress DAXing. Detecting an incoming train direction at a predictor may also occur by utilizing a second receiver attached to the track rails at a location offset from the first receiver.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 8.
Claims (3 — 1 Independent, 2 Dependent)
- Claim 1Independent Claim
A method for operating a crossing predictor, the method comprising: detecting at a first crossing predictor the presence of a train in an approach, the first crossing predictor being located at a first crossing; receiving at the first crossing predictor a first signal indicating whether a second crossing predictor spaced apart from the first crossing predictor has detected the presence of a train; and determining at the first crossing predictor whether to transmit a constant warning time signal to a device located at a second crossing based at least in part on the first signal.
- Claim 2Depends on #1
The method of claim 1 , wherein the device at the second crossing is the second crossing predictor.
- Claim 3Depends on #1
The method of claim 1 , wherein the device located at the second crossing is a third crossing predictor different from the
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (8 of 8 total)
References Cited — Backward Prior Art (50)
Non-Patent Literature (5)
- "How Railroad Crossing Signals Work", http://matt.zont.org/signals/crossing/xngworks/xngworks/html, last revised Jan. 10, 2007, 28 pages.
- C3 Trans Systems LLC, "New Crossing Technology; Model HRI 2000: Improved Grade Crossing Warning System," 2 pages, 2004.
- Crawford E. Staples, AFO Can Solve Highway Crossing Problems, Railway Signaling and Communications, vol. 52, pp. 20-26 (Sep. 1964).
- Engelbrecht, Roelof J., "The Effect of Variation in Railroad Warning Time on Traffic Signal Preemption," Texas Transportation Institute, pp. 1-17.
- English language abstract of CN 1491846, published Apr. 28, 2004.