Patents
US 8,490,701 B2#102571393 Most CitedActiveUnited States (USPTO)Utility

Methods of releasing at least one tubing string below a blow-out preventer

0Forward Citations (#102571393 Global)
0.0/yrCitation Velocity (#102571393 Global)
0.56Citation PageRank (#102571393 Global)
6Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

A method of controlling a blowout comprises: releasing at least a first tubing string into a portion of a well system, wherein the step of releasing comprises activating a release table; and causing or allowing a blowout preventer to close. The methods further comprise: compressing at least a portion of a second tubing string and a third tubing string together, wherein the step of compressing comprises activating a crimping device; cutting through the wall of at least a third tubing string, wherein the step of cutting comprises activating a cutting device, and wherein the step of cutting is performed after the step of compressing; and releasing at least the second tubing string and the third tubing string into a portion of a well system, wherein the step of releasing comprises activating a release table.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 6 · Forward citations: 0.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A method of controlling a blowout in a well system having a wellbore, comprising: releasing at least a first tubing string into the wellbore, wherein the top of the first tubing string is located below a blowout preventer after releasing, wherein the well system includes a second tubing string; and causing or allowing the blowout preventer to close, wherein the step of causing or allowing is performed after the step of releasing.

  2. Claim 2Depends on #1

    The method according to claim 1 , wherein the step of releasing comprises activating a release table, the method further comprising the step of suspending the first tubing string from the release table prior to the step of releasing.

  3. Claim 3Depends on #1

    The method according to claim 1 , wherein the step of releasing comprises activating a release table, the method further comprising the step

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (0 of 0 total)

No indexed citing patents in this generation yet. Ingest USPTO/PatentsView bulk citation tables via patents-ingest to expand the local forward citation graph.

Non-Patent Literature (1)

  • Transocean "Well Control HQS-OPS-HB-01 Well control Complications/Emergency" Issue No. 03, revision No. 00, revision date: Mar. 31, 2008 TRN-HCEC-00005542. http://democrats.energycommerce.house.gov/documents/20100512/TRO-Surface.BOP.Operations.From.Floating.Vessels.pdf.