Laying and protecting cable into existing covering surfaces
Abstract
To construct an underground cable line in-situ, cut and immediately evacuate a void in the existing covering surface. Next, lay or apply cable(s) into the void. Then, flow a non-shrinking composition into a portion of the void around the cable to fill a portion of the void. Upon rigidification the cable is encased in the void by the non-shrinking composition. Last, apply a topping material to the exposed surface of the composition in such volume as to fill any remaining portion of the void.
Interactive Citation Constellation Global Citation Ranking
Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 27 · Forward citations: 10.
Claims (1 — 1 Independent, 0 Dependent)
- Claim 1Independent Claim
A method for constructing an underground cable line in-situ through an existing covering surface disposed over a subsurface below the existing covering surface, the existing covering surface comprising a first material selected from a group consisting of pavement, paving, concrete, asphalt, blacktop, cobblestone and brick, and the subsurface comprising a second material different from the first material, the method comprising: A) cutting the existing covering surface to create a void through the existing covering surface and into the second material of the subsurface below the existing coverin
Technical Overview & Description
Full multi-page specification text is archived at the issuing office. Read complete official specification ↗
Cited By — Indexed Forward Citations (10 of 10 total)
References Cited — Backward Prior Art (27)
Non-Patent Literature (3)
- Lee Yong Ho, International Search Report, Jun. 20, 2011, 4 pages, Korean Intellectual Property Office, Republic of Korea.
- Lee Yong Ho, Written Opinion of the International Searching Authority, Jun. 20, 2011, 4 pages, Korean Intellectual Property Office, Republic of Korea.
- U.S. Appl. No. 13/796,391, filed Mar. 12, 2013, Nielsen et al.