Patents
US 8,465,689 B2#7147616 Most CitedActiveUnited States (USPTO)Utility

Elevator and method for tilting solid image build platform for reducing air entrainment and for build release

14Forward Citations (#7147616 Global)
1.1/yrCitation Velocity (#5963191 Global)
1.60Citation PageRank (#20651751 Global)
50Prior Art Cited
3Claims (1 Indep. · 2 Dep.)
0Drawings / Sheets

Abstract

A solid imaging apparatus is provided that includes a replaceable cartridge containing a source of build material and an extendable and retractable flexible transport film for transporting the build material layer-by-layer from the cartridge to the surface of a build in an image plane. An operator using the device needs merely to remove a spent cartridge and replace it with a fresh cartridge to continue solid imaging virtually uninterrupted. The apparatus also includes the capability of withdrawing and inserting an imager without the operator having to perform a separate alignment step. A brush attached to the transport film and forming part of the cartridge provides for intra-layer removal of excess uncured build material. If desired, the apparatus can produce a fully reacted build. A high intensity UV source cures the build between layers. An injection molded build pad is designed to hold a build in an inverted position for improving the build. The invention also provides for tilting the build elevator to reduce air entrainment and for releasing the build from the image plane.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 50 · Forward citations: 14.

Claims (3 — 1 Independent, 2 Dependent)

  1. Claim 1Independent Claim

    A method for facilitating release of a build object on a build platform in a solid imaging device from an image plane in the solid imaging device, said method comprising the steps of: a) solidifying solid image build material on the image plane to the build object to define a layer of the build object; b) tilting with respect to the image plane the build platform to lift one edge of the build object off the image plane, wherein tilting of the build platform is performed while lifting the build object from the image plane; and c) repeating steps (a) and (b) for at least one additional layer of

  2. Claim 2Depends on #1

    The method of claim 1 wherein the steps (a) through (b) are repeated, alternately lifting a first and a second edge.

  3. Claim 3Depends on #1

    The method of claim 1 wherein said image plane further comprises a flex

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗