hottub.patents
US 8,463,585 B2#5948164 Most CitedActiveUnited States (USPTO)Utility

Apparatus and method for modeling well designs and well performance

16Forward Citations (#5948164 Global)
1.2/yrCitation Velocity (#4912966 Global)
1.94Citation PageRank (#15207806 Global)
7Prior Art Cited
1Claims (1 Indep. · 0 Dep.)
0Drawings / Sheets

Abstract

In one aspect, a method of estimating fluid flow contribution from each producing zone of multi-zone production well is provided, which method may include: defining a wellhead pressure; determining a first inflow performance relation (IPR 1 ) between pressure and fluid inflow rate at a first producing zone and a second inflow performance relation (IPR 2 ) between pressure and fluid inflow rate at a second producing zone; determining a combined performance relation (IPRc) between pressure and fluid inflow rate at a commingle point; defining an initial fluid flow rate into the well from the first zone and an initial fluid flow rate from the second zone; generating a first fluid lift performance relation (TPR 1 ) between pressure and total fluid flow corresponding to the commingle point using the initial fluid flow rates from the first and second production zones and at least one fluid property; and determining contribution of the fluid from the first zone and the second zone at the commingle point using IPRc and TPR 1.

Interactive Citation Constellation Global Citation Ranking

Interactive SVG Citation Constellation renders in Rust/WebAssembly. Prior art cited: 7 · Forward citations: 16.

Claims (1 — 1 Independent, 0 Dependent)

  1. Claim 1Independent Claim

    A method of estimating fluid flow contribution from each production zone of a multi-zone production well for a model that is used for designing a multi-zone production well, the method comprising: (a) defining a wellhead pressure; (b) providing a model of fluid behavior of each production zone in a multi-zone production well: (c) determining, using the model, an integrated inflow performance relation (IPR 1 ) between pressure and fluid inflow from a first production zone and an integrated inflow performance relation (IPR 2 ) between pressure and fluid inflow from a second production zone; (d)

Technical Overview & Description

Full multi-page specification text is archived at the issuing office. Read complete official specification ↗

Cited By — Indexed Forward Citations (15 of 16 total)

PatentTitleYearCitations
US 11,441,395 B2Automated production optimization technique for smart well completions using real-time nodal analysis including real-time modeling20220
US 2013032335 A1System and Method for Quantifying Stimulated Rock Quality in a Wellbore—3
US 2021198981 A1Intelligent completion control in reservoir modeling—2
US 11,326,423 B2Automated production optimization technique for smart well completions using real-time nodal analysis including recommending changes to downhole settings20223
US 10,508,521 B2Iterative method for estimating productivity index (PI) values in maximum reservoir contact (MRC) multilateral completions20192
US 9,471,730 B2Generalized inflow performance model for oil wells of any inclined angle and a computer-implemented method thereof20163
US 10,370,941 B2Well performance index method for evaluating well performance20190
US 10,810,330 B2Integrated modeling and simulation of formation and well performance20200
US 11,821,289 B2Automated production optimization technique for smart well completions using real-time nodal analysis20231
US 12,163,411 B2Intelligent completion control in reservoir modeling20240
US 11,499,423 B2Automated production optimization technique for smart well completions using real-time nodal analysis including comingled production calibration20220
US 9,574,433 B2System and method for quantifying stimulated rock quality in a wellbore20174
US 10,578,770 B2Method of estimating an inflow performance relationship an oil well20200
US D975107 SPortion of a display screen with graphical user interface202318
US 2012330466 A1Operational logic for pressure control of a wellhead—24

Non-Patent Literature (2)

  • Mohajer; "Utilizing Online Water Detection to Automate Production Management," SPE-118075-PP, 2008 Abu Dhabi International Petroleum Exhibition and Conference, Nov. 3-6, 2008, pp. 1-4.
  • Sun et al.; "Interaction Between Intelligent Well Applications and Reservoir Management-A comprehensive thermal modeling technology for IWS well," SPE 115102, 2008 SPE Annual Technical Conference and Exhibition, Denver, Colorado, Sep. 21-24, 2008, pp. 1-15.